RA unveils strategic priorities, digital plans

NAMPA
2026-03-27
WINDHOEK, 05 November 2025 - The Board of Directors of the Roads Authority (RA) has announced the appointment of Mbahupu Hippy Tjivikua as the authority's new Chief Executive Officer, effective 01 January 2026. (Photo: Contributed) WINDHOEK, 05 November 2025 - The Board of Directors of the Roads Authority (RA) has announced the appointment of Mbahupu Hippy Tjivikua as the authority's new Chief Executive Officer, effective 01 January 2026. (Photo: Contributed)
WINDHOEK, 27 MAR (NAMPA) - The Roads Authority (RA) has prioritised the rehabilitation of ageing road infrastructure, improved maintenance and the rollout of digital services to enhance service delivery across Namibia.

RA Chief Executive Officer, Hippy Mbahupu Tjivikua, said this during a media engagement held in Windhoek on Thursday.

He said the authority is dealing with an ageing road network, with some roads having exceeded their design lifespan, while recent heavy rains have caused further damage to infrastructure in parts of the country.

“Our teams are already on the ground attending to emergency repairs on roads affected by rain damage,” he said.

Tjivikua said infrastructure development should be planned with future demand in mind.

“We do not build infrastructure for now, but for the next 20 to 50 years,” he said.

He added that key road corridors across the country are being prioritised for rehabilitation and upgrading, while a new strategic plan is set to be launched next month.

Road safety, he said, remains a key priority, and he called for increased public awareness and responsible use of roads.

“Every life lost on our roads is one too many,” he said.

RA Executive Officer for Engineering Services Conrad Lutombi Muatjetjeja said Namibia’s road network stretches over approximately 50 000 kilometres and consists of both surfaced and unsurfaced roads.

He said the authority requires about N.dollars 5 billion annually to maintain the network effectively, but current funding levels remain below this, contributing to a maintenance backlog.

“If maintenance is not done on time, the cost increases and ultimately affects the road user,” he said.

Meanwhile, Acting Executive Officer for Transportation Tauko Nambinga said the authority is implementing digital systems to improve access to services.

“We are digitising our services to allow customers to access them from anywhere at any time,” he said.
(NAMPA)
MWY/HP

Latest NAMPA photos

WINDHOEK, 26 March 2026 - Vice president Lucia Witbooi (second from left) receives donated equipment bound for Mokganedi Tlhabanelo High School from Pupkewitz Megabuild's Financial Director, Danie Du Toit (right). (Photo by: Ali Negumbo) NAMPA

WINDHOEK, 26 March 2026 - Vice president Lucia Witbooi (second from left) receives donated equipment bound for Mokganedi Tlhabanelo High School from Pupkewitz Megabuild's Financial Director, Danie Du Toit (right). (Photo by: Ali Negumbo) NAMPA

NAMPA
KARIBIB, 20 March 2026 - Chief Executive Officer of the Karibib Town Council Tangeni Enkono. (Photo by: Isabel Bento) NAMPA

KARIBIB, 20 March 2026 - Chief Executive Officer of the Karibib Town Council Tangeni Enkono. (Photo by: Isabel Bento) NAMPA

NAMPA
KARIBIB, 20 March 2026 - Children fetching water at a prepaid water station in the Harambee informal settlement in Karibib. (Photo by: Isabel Bento) NAMPA

KARIBIB, 20 March 2026 - Children fetching water at a prepaid water station in the Harambee informal settlement in Karibib. (Photo by: Isabel Bento) NAMPA

NAMPA
KARIBIB, 20 March 2026 - A portion of the Haraambe Informal settlement in Karibib. (Photo by: Isabel Bento) NAMPA

KARIBIB, 20 March 2026 - A portion of the Haraambe Informal settlement in Karibib. (Photo by: Isabel Bento) NAMPA

NAMPA
NEU-SCHWABEN, 22 March 2026 - Raw tourmaline extracted in a mining pit at the Neu-Schwaben small-scale mining settlement. (Photo by: Isabel Bento) NAMPA

NEU-SCHWABEN, 22 March 2026 - Raw tourmaline extracted in a mining pit at the Neu-Schwaben small-scale mining settlement. (Photo by: Isabel Bento) NAMPA

NAMPA
NEU-SCHWABEN, 22 March 2026 - Chairperson of the Small-scale miners at New-Schwaben Metirapi Lucky Kapekarua looks on as an excavator digs in a mining pit for extraction of tourmaline. (Photo by: Isabel Bento) NAMPA

NEU-SCHWABEN, 22 March 2026 - Chairperson of the Small-scale miners at New-Schwaben Metirapi Lucky Kapekarua looks on as an excavator digs in a mining pit for extraction of tourmaline. (Photo by: Isabel Bento) NAMPA

NAMPA
WINDHOEK, 25 March 2026 - The Motor Vehicle Accident (MVA) Fund has intensified efforts to reduce road crashes by placing greater emphasis on the health and wellbeing of truck drivers through its Truckers’ Wellness Campaign. (Photo: Contributed)

WINDHOEK, 25 March 2026 - The Motor Vehicle Accident (MVA) Fund has intensified efforts to reduce road crashes by placing greater emphasis on the health and wellbeing of truck drivers through its Truckers’ Wellness Campaign. (Photo: Contributed)

NAMPA
NANKUNTWE, 10 March 2026 – The Nankuntwe Combined School and two other schools that were closed recently will relocate to higher ground, where they will operate from tents. Nankuntwe CS will operate from Luhonono. (Photo: Contributed)

NANKUNTWE, 10 March 2026 – The Nankuntwe Combined School and two other schools that were closed recently will relocate to higher ground, where they will operate from tents. Nankuntwe CS will operate from Luhonono. (Photo: Contributed)

NAMPA