Driver arrested after allegedly causing Mariental power outage

NAMPA
2024-09-06
MARIENTAL, 05 September 2024 - A car accident in the Takarania informal settlement of Mariental led to a power outage in the southern town on Thursday. (Photo by: Charmaine Boois) NAMPA MARIENTAL, 05 September 2024 - A car accident in the Takarania informal settlement of Mariental led to a power outage in the southern town on Thursday. (Photo by: Charmaine Boois) NAMPA
MARIENTAL, 06 SEP (NAMPA) – A 28-year-old man has been arrested following a vehicle accident on Thursday in the Takarania informal settlement at Mariental which caused a power outage.
The incident occurred around 07h00 and involved a collision with the main NamPower electricity supply line, resulting in a full-day power outage across Mariental.
This was confirmed by Chief Inspector Charles Goagoseb of the Namibian Police at Mariental.
In an inte...
Restricted content

Latest NAMPA photos

SWAKOPMUND, 18 June 2026 - Erongo Governor Natalia /Goagoses. 

(Photo contributed) NAMPA

SWAKOPMUND, 18 June 2026 - Erongo Governor Natalia /Goagoses. (Photo contributed) NAMPA

NAMPA
OMATJETE, 16 June 2026 - Erongo Governor Natalia /Goagoses, during the launch of the Roads Authority’s mobile unit, Natis on Wheels. 

(Photo by: Chelva) NAMPA

OMATJETE, 16 June 2026 - Erongo Governor Natalia /Goagoses, during the launch of the Roads Authority’s mobile unit, Natis on Wheels. (Photo by: Chelva) NAMPA

NAMPA
SWAKOPMUND, 18 June 2026 - Education officials, school principals, teachers, learners, community leaders and other stakeholders of education attending the Erongo Region Education conference to assess challenges facing the sector. (Photo by: Isabel Bento) NAMPA

SWAKOPMUND, 18 June 2026 - Education officials, school principals, teachers, learners, community leaders and other stakeholders of education attending the Erongo Region Education conference to assess challenges facing the sector. (Photo by: Isabel Bento) NAMPA

NAMPA
WINDHOEK, 17 June 2026 - Prime Minister Elijah Ngurare pictured with Ovaherero Chief Professor Mutjinde Katjiua during a recent meeting in Windhoek. (Photo: Contributed) NAMPA.

WINDHOEK, 17 June 2026 - Prime Minister Elijah Ngurare pictured with Ovaherero Chief Professor Mutjinde Katjiua during a recent meeting in Windhoek. (Photo: Contributed) NAMPA.

NAMPA
SWAKOPMUND, 17 June 2026 - Erongo Governor Natalia /Goagoses delivering her Sate of the Region Address. She is dressed in the uniform of the National Youth Service, in solidarity with the Namibian youth and their plight in fighting against unemployment. (Photo by: Isabel Bento) NAMPA

SWAKOPMUND, 17 June 2026 - Erongo Governor Natalia /Goagoses delivering her Sate of the Region Address. She is dressed in the uniform of the National Youth Service, in solidarity with the Namibian youth and their plight in fighting against unemployment. (Photo by: Isabel Bento) NAMPA

NAMPA
SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining.

(Photo by: Josephina Simeon) NAMPA

SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining. (Photo by: Josephina Simeon) NAMPA

NAMPA
SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining.

(Photo by: Josephina Simeon) NAMPA

SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining. (Photo by: Josephina Simeon) NAMPA

NAMPA
UIS, 16 June 2026 -

Uis in the Erongo Region, was upgraded from settlement to town status, becoming the region’s eighth local authority, ǀGoagoses said in her second State of the Region Address delivered in Swakopmund, with N.dollars 1 million allocated for an Infrastructure Master Plan and N.dollars 8.5 million for an ongoing bulk water pipeline.

(Photo by: Josephina Simeon) NAMPA

UIS, 16 June 2026 - Uis in the Erongo Region, was upgraded from settlement to town status, becoming the region’s eighth local authority, ǀGoagoses said in her second State of the Region Address delivered in Swakopmund, with N.dollars 1 million allocated for an Infrastructure Master Plan and N.dollars 8.5 million for an ongoing bulk water pipeline. (Photo by: Josephina Simeon) NAMPA

NAMPA