Geneva, June 19, 2026 (AFP) - US-Iran talks planned in Switzerland Friday postponed: Bern

NAMPA / AFP
2026-06-19
Switzerland announced Friday that planned talks on implementing a US-Iran memorandum of understanding to end the Middle East war had been postponed, hours after US Vice President JD Vance's departure for the Alpine country was cancelled. "The planned talks between the US, Iran, Qatar and Pakistan have been postponed," the Swiss foreign ministry said in a message to AFP. "Switzerland remains ready to facilitate these talks. The relevant preparato......
Restricted content

Latest NAMPA photos

SWAKOPMUND, 18 June 2026 - Erongo Governor Natalia /Goagoses. 

(Photo contributed) NAMPA

SWAKOPMUND, 18 June 2026 - Erongo Governor Natalia /Goagoses. (Photo contributed) NAMPA

NAMPA
OMATJETE, 16 June 2026 - Erongo Governor Natalia /Goagoses, during the launch of the Roads Authority’s mobile unit, Natis on Wheels. 

(Photo by: Chelva) NAMPA

OMATJETE, 16 June 2026 - Erongo Governor Natalia /Goagoses, during the launch of the Roads Authority’s mobile unit, Natis on Wheels. (Photo by: Chelva) NAMPA

NAMPA
SWAKOPMUND, 18 June 2026 - Education officials, school principals, teachers, learners, community leaders and other stakeholders of education attending the Erongo Region Education conference to assess challenges facing the sector. (Photo by: Isabel Bento) NAMPA

SWAKOPMUND, 18 June 2026 - Education officials, school principals, teachers, learners, community leaders and other stakeholders of education attending the Erongo Region Education conference to assess challenges facing the sector. (Photo by: Isabel Bento) NAMPA

NAMPA
WINDHOEK, 17 June 2026 - Prime Minister Elijah Ngurare pictured with Ovaherero Chief Professor Mutjinde Katjiua during a recent meeting in Windhoek. (Photo: Contributed) NAMPA.

WINDHOEK, 17 June 2026 - Prime Minister Elijah Ngurare pictured with Ovaherero Chief Professor Mutjinde Katjiua during a recent meeting in Windhoek. (Photo: Contributed) NAMPA.

NAMPA
SWAKOPMUND, 17 June 2026 - Erongo Governor Natalia /Goagoses delivering her Sate of the Region Address. She is dressed in the uniform of the National Youth Service, in solidarity with the Namibian youth and their plight in fighting against unemployment. (Photo by: Isabel Bento) NAMPA

SWAKOPMUND, 17 June 2026 - Erongo Governor Natalia /Goagoses delivering her Sate of the Region Address. She is dressed in the uniform of the National Youth Service, in solidarity with the Namibian youth and their plight in fighting against unemployment. (Photo by: Isabel Bento) NAMPA

NAMPA
SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining.

(Photo by: Josephina Simeon) NAMPA

SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining. (Photo by: Josephina Simeon) NAMPA

NAMPA
SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining.

(Photo by: Josephina Simeon) NAMPA

SWAKOPMUND, 16 June 2026 - Erongo Governor Natalia ǀGoagoses during her State of the Region Address (SORA) stated that the C35 Swakopmund/Henties Bay/Uis Main Road, costing N.dollars 1.03 billion, was 86 per cent complete with 16 kilometres remaining. (Photo by: Josephina Simeon) NAMPA

NAMPA
UIS, 16 June 2026 -

Uis in the Erongo Region, was upgraded from settlement to town status, becoming the region’s eighth local authority, ǀGoagoses said in her second State of the Region Address delivered in Swakopmund, with N.dollars 1 million allocated for an Infrastructure Master Plan and N.dollars 8.5 million for an ongoing bulk water pipeline.

(Photo by: Josephina Simeon) NAMPA

UIS, 16 June 2026 - Uis in the Erongo Region, was upgraded from settlement to town status, becoming the region’s eighth local authority, ǀGoagoses said in her second State of the Region Address delivered in Swakopmund, with N.dollars 1 million allocated for an Infrastructure Master Plan and N.dollars 8.5 million for an ongoing bulk water pipeline. (Photo by: Josephina Simeon) NAMPA

NAMPA